Assembly Preparation
Shorten the time it takes to assemble your FarmBot by following these preliminary steps
Installation tips
Watch the short video below to understand how to provide power, water, and an internet connection to your FarmBot in a safe a reliable way.
Organize your parts
When you first open up your FarmBot hardware package, pull out all of the component bags and boxes so that you develop a full idea of what’s included, and so that you can place them on a table in locations that make sense to you. For the most part, components are already organized inside the boxes, but it is still good to take a look over everything.
Handle with care
The aluminum extrusions may have sharp corners and edges.
We'll make it right
If anything is missing or damaged from your box of components, let us know right away at contact@farm.bot. We’ll ship out replacement parts as soon as we can.
Plan accordingly
FarmBot Genesis is a complex machine with over 1,000 components in total. Be prepared to spend the following amount of time assembling your FarmBot. Remember, these are just assembly time estimations. Depending on your skill level you may need more or less time. Consider assembling FarmBot with a friend to significantly speed things up and help reduce mistakes.
Subassembly | Estimated Time (Genesis) | Estimated Time (Genesis XL) |
---|---|---|
Supporting Infrastructure | 8 hours (raised bed) |
12 hours (raised bed) |
Tracks | 2 hours | 4 hours |
Gantry | 2 hours | 2 hours |
Cross-Slide | 1 hour | 1 hour |
Z-Axis | 1 hour | 1 hour |
Cables and Tubing | 2 hours | 3 hours |
Electronics Box | 30 minutes | 30 minutes |
TOTAL | 17 hours | 25 hours |